Kingston Road

basement construction in Wimbledon SW20

Construction of a large two storey deep basement and concrete frame for a mixed development.

  • Client: Bridge Building and Construction
  • Location: Wimbledon SW20
  • Date: 19/01/2009

Excavation.

Construction of pile caps.

Construction of pile caps.

Installation of concrete.

Excavation for underground pump chamber.

Pouring concrete into one sided wall formwork.

Steel reinforcement.

Henry hiding in the steel reinforcement.

Ground floor slab.

First floor slab.