ABC Cinema

formwork in Streatham, London

Construction of piled foundations; installation of steel sheet piling; basement for a swimming pool and leisure complex; 6 storey concrete frame for a residential development. Retention of the front of the original building.

  • Location: Streatham, London
  • Date: 2000
  • Duration: 10 months
  • Cost: 2.6m

Excavation of site with retention of the front of the original building.

Excavation of basement.

Excavation of pile caps.

Construction of pile caps and ground beams.

Construction of pile caps and ground beams.

Construction of pile caps and ground beams.

Construction of pile caps and ground beams.

Fixing reinforcement.

Concrete to ground beams, pile caps and ground floor slab.

Concrete to ground beams, pile caps and ground floor slab.

RC frame construction.

RC frame construction.

RC frame construction.

RC frame construction.

RC frame construction.

RC frame construction.

RC frame construction.

RC frame construction.

One of the lads sitting down on the job!

RC frame construction.

RC frame construction.

RC frame construction.

Flying formwork table.

Flying formwork table.

Flying formwork table.

RC frame.

RC frame.

RC frame.