Parkside

basement construction in Wimbledon

Complex, 3 storey basement, circa 9m deep, with swimming pool and RC frame for a new house, with exposed finished concrete. The water table on this job was very high so as well as a secant piled solution we also had to de-water the site.

  • Location: Wimbledon

One sided formwork

Excavation, within a secant piled coffer dam.

Excavation.

Temporary works propping.

Installing formwork.

RC one sided wall.

Fixing reinforcement.

Basement overview.

Roof

RC frame for the house.